The objectives tutorial are as follows:
The practice described in this tutorial will be carried out in a computer classroom.
It will last 2 teaching hours.
Note: the duration of the tutorial depends on the professionalism of the teacher.
Hardware require: computer room with computers with access to multimedia and internet. Required software: BIM 360 BUILD module Cost Management.
5.1 – Introduction
5.2 – The BIM methodology application in public procurement/tenders
5.3 – Guidelines for information exchange processes in the context of public procurement
5.4 – Stages of public procurement organization
5.4.1 1st stage
5.4.2 2nd stage
5.4.3 3rd stage
5.5 – Recommendations
To assess the achievement of the practice, students will write a report of 2 pages maximum and will have to answer the submitted test questionnaires.
In this report, the student will explain the BIM methodology in the construction sector in public procurement / tenders. Is able is able to identify the main groups of criteria for preparation for the application of BIM methodology.
The student is acquainted with the BIM methodology and is able to apply it in public procurement / tenders in the construction sector.